Untitled Document
Untitled Document

Home

About us
Over View
Resources
Clients
Servcies
Contact us


  Our Goals
"Working hardly to build an organization of responsibility taking employees, working side by side for a better future for all. ”
"
Services>>>>>>ADSL Cables installations

We continue keeping on the following Key Features:
1-Improving end-to-end network performance while decreasing operating costs.
2-Meet implementation time schedules and avoid costly deployment delay.
3-Improving customer satisfaction by improving quality of service.

Showing the steps of our following photos are the achieved of Ain Shams and Helwan Centrals:
1-
laying cables on the trays:
Starting the work from laying cables on
trays between blocks and the ADSL rack
or between the DSLAM and the ADSL
rack.
2-tying cables:
The second step is tying cables.
3-punch cables to the blocks:
Working on all types of blocks preparing
cables and forming the blocks to punch
cables to the blocks.
4-numbering cables:
Also using champ printed stacker labels and block printed labels to number cables
and the blocks.
5-using heat shrunk tube:
Using heat shrink tube in the preparation to
protect cables from any damage that may
occur to the cable.
6-preparing champs:
Using CHAMP Portable Hand Operated Tool in Preparing champs in the standard
color code.
Taking into consideration that the length of the cables terminals is equal to get more
quality.


Untitled Document
Our Clients

Untitled Document